Shore Power Connection Box
Shore Power Components

Shore Power Connection Box

Ship shore connection boxes - LV 63A-350A and HV up to 15kV, IP66, with emergency stop and ship-shore interlock. Compliant with IEC/IEEE 80005 systems.

Specifications

LV ratings
63A / 125A / 250A / 350A
HV ratings
6.6kV / 11kV / 15kV
Protection
IP66, 316L or hot-dip galvanized steel
Safety
emergency stop, ship-shore interlock
Standard
IEC / IEEE 80005 compliant
Lead time
15-30 working days

The Interface Point of Every Shore Power Berth

The connection box houses sockets, protection relays and interlocks where the ship connects to the quay - built to IEC and IEEE 80005 system requirements.

AFIR Deadline Ready

From 1 January 2030, EU AFIR Regulation 2023/1804 requires TEN-T core maritime ports to provide shore power for container and passenger ships. Boxes ship with type approval documents for tender files.